- Location
- Höfen/Enzkreis
- Year
- 2014
- Task
- Over-planning of a road guidance with slope removal and new construction of a retaining wall
- Builder
- Country Baden-Württemberg / Regierungspräsidium Karlsruhe
- Construction Material
- reinforced concrete
- Special Features
- 10m high and 100m long with micro piles back-anchored retaining wall
- Activity
- Creation of the structural design, the static calculation of the construction as well as the compilation of the construction book and monitoring of the load tests of the micropiles
- Image Gallery
{"slide_to_show":"2","slide_to_scroll":"1","autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true","rtl":"false"}