- Location
- Sindelfingen
- Year
- 2015
- Task
- New construction of production and logistics building
- Builder
- Helmut Fischer GmbH Institut für Elektronik und Messtechnik
- Construction Material
- Reinforced concrete, steel, masonry
- Special Features
- 4-storey industrial building with high-bay warehouse and vibration-decoupled metrological laboratories
- Activity
- Creation of the structural design, the static calculation and earthquake investigations, the structural fire protection for the building as well as the construction and workshop drawings for the steel construction
- Image Gallery
{"slide_to_show":"2","slide_to_scroll":"1","autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true","rtl":"false"}