- Location
- Chempark Dormagen
- Year
- 2012 - 2014
- Task
- Construction of the largest Kemira production plant for water chemicals in Europe
- Builder
- Kemira Germany GmbH
- Construction Material
- Steel and reinforced concrete
- Special Features
- Several multi-storey buildings and pipe bridges in steel and reinforced concrete as well as container foundations on a construction field with approx. 70m x 70m.
- Activity
- Creation of the structural design, the static calculation as well as the construction and workshop drawings for the entire steel and reinforced concrete construction.
- Image Gallery
{"slide_to_show":"2","slide_to_scroll":"1","autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true","rtl":"false"}