- Location
- Podgorica, Montenegro
- Year
- 2008
- Task
- Extension and new construction of a pipeline and chimney system
- Builder
- Kombinat aluminijuma A.D. Podgorica
- Construction Material
- Steel
- Special Features
- Piping system with several hundred meters in length and about 2m diameter of pipes with various suspension and support systems and several branches and vertical and horizontal directional changes and a 30m high Kamingruppe of 6 fireplaces with attached work platforms and stair access
- Activity
- Design and construction of pipelines and chimneys (with attached work platforms), carrying out the structural safety and dynamic tests, earthquake tests according to DIN 4149 and EC 8, vibration tests for chimney group and consideration of durability
- Image Gallery
{"slide_to_show":"2","slide_to_scroll":"1","autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true","rtl":"false"}