- Location
- Speyer
- Year
- 2012
- Task
- Renovation of the Rhine bridge
- Builder
- RP Karlsruhe
- Construction Material
- Steel
- Special Features
- The Rhine Bridge Speyer spans the Rhine three kilometers north of the center of Speyer. The road overpass with a single-girder cable-stayed bridge in the river area is part of the Federal Highway 61 and lies between the connection points Speyer and Hockenheim. The bridge train is a total of 758 m long and has two lanes and a lane for each directional carriageway.
- Activity
- Welding monitoring and creation of the WPS (Welding Procedure Specification) for the assembly structures