- Location
- Flensburg
- Year
- 2014
- Task
- New construction of a parking garage with 275 parking spaces
- Builder
- Formart GmbH & Co. KG
- Construction Material
- Reinforced concrete, steel, steel composite
- Special Features
- 6-storey car park with spindle access and access bridges to the existing parking decks of the Karstadt building
- Activity
- Implementation of the BIM management / creation of the BIM model, on the basis of which the work planning, the structural design, the steel construction, precast and facade construction and workshop drawings were created and the material order, the assembly sections and component deliveries were planned and executed. Creation of structural design, static calculation and earthquake investigations, structural fire protection. Creation of construction and workshop drawings, as well as assembly planning and division of component deliveries.
- Image Gallery
{"slide_to_show":"2","slide_to_scroll":"1","autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"true","rtl":"false"}